Skip to content

Dryer WHIRLPOOL WP C9 WBS EE, 9 kg, C, Heat pump

Original price €835,90 - Original price €835,90
Original price
€835,90
€835,90 - €835,90
Current price €835,90
SKU DGT0214104
Ships within 7 business days Please note that quantities are limited and dynamic. At the time of ordering, the item may be out of stock. We will notify you in a timely manner in the event that we are unable to fulfill the order.

Избери период за изплащане и виж месечната вноска

Месечна вноска Обща сума за плащане ГПР Лихва Банка

Description

Main features:

  • Capacity: 9 kg
  • Energy class: C
  • Drying type: With heat pump
  • Colour: White
  • Installation type: Freestanding
  • 6th Sense technology: Automatically adjusts settings according to the moisture in the drum, ensuring optimal drying results and fabric protection

Technical specifications:

  • Dimensions (H x W x D): 84.6 x 59.8 x 67.4 cm
  • Depth with door open (at 90°): 104 cm
  • Weight: 46 kg
  • Drum volume: 127 l
  • Noise level: 63 dB
  • Energy consumption (full load): 1.61 kWh
  • Annual energy consumption: 195 kWh
  • Condensation class: A (91% efficiency)
  • Standard programme duration (full load): 195 minutes
  • Power supply: 230–240 V / 50 Hz / 800 W
  • Power cable length: 150 cm
  • Plug: Schuko

Functions and convenience:

  • Humidity sensors: Automatically adjust drying time
  • Water tank full indicator: Yes
  • Clogged filter indicator: Yes
  • Delayed start: Up to 24 hours
  • Digital display with countdown: Yes
  • Anti-crease: Yes
  • Intuitive control panel: Easy to use

Warranty: 24 months

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare