Skip to content

Built-in hob Whirlpool WB S2560 NE

Original price €493,58 - Original price €493,58
Original price
€493,58
€493,58 - €493,58
Current price €493,58
SKU DGT0102447
Ships within 3 business days Please note that quantities are limited and dynamic. At the time of ordering, the item may be out of stock. We will notify you in a timely manner in the event that we are unable to fulfill the order.

Избери период за изплащане и виж месечната вноска

Месечна вноска Обща сума за плащане ГПР Лихва Банка

Description

Technical specifications:

Dimensions

  • Height 54 mm
  • Width 590 mm
  • Depth 510 mm
  • Niche depth 480 mm
  • Maximum niche width 562 mm
  • Minimum niche width 560 mm

Characteristics

  • Power Supply Electric
  • Number of electric cooking zones 4
  • Number of induction hobs 4
  • Timer Yes
  • Control panel position Front
  • EAN code 8003437601033
  • Construction type Built-in
  • Control type Electronic
  • Power cable length (cm) 120
  • Current (A) 31.3
  • Power On Indicator Yes
  • Separate residual heat indicator
  • Main On/Off Switch Yes

Warranty: 24 months

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare